Connect with Us
Podcasts & RSS Feeds
| All Content |
| RSS |
| View all podcasts & RSS feeds | ||
Most Active Stories
- Now That 'Ink's Dry' on HB 5, Future of Texas Education Bill Secured
- Kerbey Lane 'Eat-In' Seeks Cafe at Mueller Development (Update)
- Street Closure Map: 2013 ROT Rally and Juneteenth Parade
- Two Big Education Bills Gain Approval from Texas Legislature
- With Tube Rentals, East Austin Beach Not So 'Secret' Anymore
KUT News Staff
Waller Creek
Photos: Inside the Waller Creek Tunnel
On Saturday, members of the media were invited to check progress on the Waller Creek tunnel, currently being burrowed some 70 feet underground.
When finished, the tunnel will stretch just over a mile from Waterloo Park to an outlet at Lady Bird Lake. The tunnel will create a steady flow for Waller Creek, and inlets along the creek will prevent water from overflowing, pulling 1 million square feet of developable land out of the 100-year floodplain downtown.
A design competition plotting the future of the Waller Creek area is unfolding alongside the tunnel excavation.
The contractor has completed excavating a 26 foot-wide vertical shaft at Fourth Street and is currently tunneling both north and south. So far, approximately 1,300 feet of the tunnel have been excavated.
KUT News freelancer Jeff Heimsath shot these photos of the tunnel and construction site this weekend.
-
Austin
-
Downtown
-
development



